乍看上去

与项目团队紧密合作,以提供足够的设计细节和现场建设实施援助,允许在时间和预算范围内项目的完成。

项目介绍

The nation of Sweden selected a site along the banks of Rock Creek near the Potomac River in Washington, D.C. for its new embassy in the U.S. Rock Creek, under the jurisdiction of the National Park Service, serves as a valuable natural and recreational resource for the Washington metropolitan region. Concerned about the potential impacts of the new embassy on the physical stability and ecological integrity of Rock Creek, the developers of the site, Armada Hoffler Construction, contracted Biohabitats to develop a streambank stabilization plan utilizing a natural materials approach. Challenges included a very short construction schedule, logistical constraints, and the project’s high profile, urban location adjacent to the confluence of Rock Creek and the tidal Potomac River.

栖息生物监测的场地条件,包括潮汐涨落,生物基准和参考点。栖息生物开发的替代的设计理念,并与设计师,建筑师和开发商合作开发岸线/河岸稳定的做法和远足/自行车道与网站开发信封和建设特征一致。栖息生物也得到了美国联邦和地方的许可证,开发概念重建预案,并征求了五名承办建议,参与该项目的设计和施工的完成。

细节

生物区

切萨皮克/特拉华海湾

自然地理省

秋季系列 - 皮埃蒙特/沿海平原

分水岭

波托马克

专业领域

气候变化,海岸,保护,设计及建造,生态修复,城市生态,水

所有者

华盛顿特区的舰队Hoffler建设

位置

华盛顿 , 哥伦比亚特区 ,美国

项目团队
  • 环境质量资源